---------------------------------- New
----------------------------------------------
Steps of an Environmental Investigation
(Flowchart)
------------------------------------------------------------------------------------------
Tips to
help in the processing of environmental submissions to
SLPC
- Ensure that the CD
is properly labeled.
- Ensure the SBA
Reliance Letter is not altered or modified.
- Send in new
documents for resubmissions – not all documents.
- Attach the
screen-out with the resubmission.
- Address the past
and current use of the property and the adjoining properties in an
Environmental Questionnaire (EQ).
- Ensure the EQ
is signed by the owner or operator of the property
- Ensure the CDC
Checklist has comments and is signed by the CDC.
- Provide the loan
number or the control number on the CDC Checklist.
- If
a loan is approved after pre-application, include the control number so the
documents can be associated with the pre-application file.
- If
a records search and risk assessment (RSRA) states anything other than a "low
risk", a Phase 1 Assessment is the minimum requirement for
submission.
- Ensure all
recommendations by the environmental professional are completed prior to
submission to SLPC.
- Ensure the
addresses on the CDC Checklist and the environmental documents match the
address on the loan authorization.
- Ensure the correct
NAICS code is included on the CDC Checklist.
- Ensure the CDC
Checklist is included for all environmental document submittals.
- Ensure the SBA
Reliance Letter has the same date as the Transaction Screen Analysis (TSA),
Phase 1 Assessment or Phase 2 Assessment.
- Ensure the SBA
Reliance Letter and Certificate of Professional Liability Insurance accompanies
the TSA, Phase 1 Assessment or Phase 2 Assessment.
- The Phase 1
Assessment for a gas station must include a determination whether or not the
gas station is in compliance with all state requirements, if any, pertaining to
tank and equipment testing.
v Minimum requirements for
environmental submissions
- If the property is in an
environmental sensitive industry as defined in Appendix 4 of SBA SOP 50 10 5,
then a Phase 1 Assessment is required.
- If the property is
not in an environmental sensitive industry as defined in Appendix 4 of SBA SOP
50 10 5 and the loan is less than or equal to $150k, then an Environmental
Questionnaire is the minimum requirement for submission.
- If the property is
not in an environmental sensitive industry as defined in Appendix 4 of SBA SOP
50 10 5 and the loan is greater than $150k, then an Environmental Questionnaire
and a Records Search and Risk Assessment are the minimum requirements for
submission.
- If the
owner/operator of the site is unable or unwilling to sign an environmental
questionnaire, then a Transaction Screen Analysis is the minimum requirement
for submission.
v Environmental
References
collab.sba.gov/sops/Documents/5010/5010_5e_Clean.pdf
- EPA All
Appropriate Inquiries (AAI)
www.epa.gov/fedrgstr/EPA-WASTE/2005/November/Day-01/f21455.htm
www.census.gov/eos/www/naics/
v Environmental
Documents
v General
Inquiries
- Please submit all
general environmental inquiries to the Sacramento 504
Environmental Inbox
at Sacramento504environmental@sba.gov
v SLPC Environmental
Engineers